Home page
Search

News Flash

Asphalt Rejuvenation - NO PARKING

Pingree Grove News Posted on August 20, 2024

Dear Resident,

The Village ofPingree Grove will be performing asphalt rejuvenating maintenance on your village roads. Please be advised that the contractor CAM, LLC is scheduled to do work on your street starting August 22 . Consequently, there will be No On-Street Parking from Thursday Aug 22na thru Saturday Aug 24Ith Between the hours of 8:00 am until 4:00 pm.

If you have a lawn sprinkling system that sprays or drains onto the street pavement you should turn it off for the day in which work will be performed on your street and one day following the treatment. Also please refrain from discharging your sump pump onto the street during this time.

Treatment FAQ:

Why is this product being applied to my road? CAM, LLC will be applying Reclamite Maltene Based Rejuvenating Agent to your roads. Reclamite is a product designed to extend the life of the pavement by sealing the pavement from the elements. This penetrating sealer is the most widely used pavement rejuvenator in the market for over 50 years, and will assist in minimizing the need for more costly and disruptive methods of street repair.

How long does the process take? Once our small crew begins work on your street, the process will usually only take one to two hours. Please obey all signs and crew direction. Once the road has been treated with lime screenings, the road will be fully opened to traffic.

When can I drive on the road?  You can exit your driveway and drive through the work area, but please go slow and stay on the area treated with sand/screenings. Please be advised that driving onto a driveway before the contractor is finished applying the limestone/sand may cause vehicle tires to track some of the product onto driveways and sidewalks. These markings are not pennanent, and will naturally fade within a few weeks. 

When will the road be cleaned up? After the product is applied, an application of limestone screenings will be applied to the road. This is not permanent. The screenings will be swept up in a day or two after the product is applied. These agents are environmentally safe and extend the pavements life. If caution and reduced speeds are taken when driving on recently treated roadways, the transfer of material from the roadway to your vehicle is unlikely. If you do have product that has transferred to your vehicle, it is non corrosive and will not damage your vehicle. A bug and tar remover (available at any local auto parts store) will safely remove any material on your vehicle. Please work with us through any inconveniences during the application process. Thanks for your patience, CAM, LLC

Construction Street Rejuvenation 2024



  1. Village of Pingree Grove
    555 Reinking Road, Pingree Grove, IL 60140
    Phone: 847-464-5533
    Email Pingree Grove
    Monday through Friday: 8:00 am to 4:30 pm 

  1. Home page

  1. Police Department
    One Police Plaza, Pingree Grove, IL 60140
    Emergency & Dispatch: 911
    Non-Emergency Phone: 630-232-8400
    Admin Phone: 847-464-4600
    Email Pingree Grove Police Department

Government Websites by CivicPlus®
Arrow Left Arrow Right
Slideshow Left Arrow Slideshow Right Arrow